Cover of Volume: Bauingenieur Volume 100 (2025), Edition 11
, to see if you have full access to this publication.
Volume No access

Volume 100 (2025), Edition 11

Bauingenieur
Authors:
Journal:
Bauingenieur
Publisher:
 2025


Bibliographic data

ISSN-Print
0005-6650
ISSN-Online
0005-6650
Publisher
VDI fachmedien, Düsseldorf
Language
German
Product type
Volume

Articles

Cover of Volume: Bauingenieur Volume 100 (2025), Edition 11
Article
No access

Page 1 - 6
VDI Fachmedien GmbH & Co. KG, Düsseldorf 2025

Cover of Volume: Bauingenieur Volume 100 (2025), Edition 11
Article
No access

Page A 7 - A 12
VDI Fachmedien GmbH & Co. KG, Düsseldorf 2025

Cover of Volume: Bauingenieur Volume 100 (2025), Edition 11
Article
No access

Page A 13 - A 15
VDI Fachmedien GmbH & Co. KG, Düsseldorf 2025

Cover of Volume: Bauingenieur Volume 100 (2025), Edition 11
Article
No access

Page A 17 - A 19
VDI Fachmedien GmbH & Co. KG, Düsseldorf 2025

Cover of Volume: Bauingenieur Volume 100 (2025), Edition 11
Article
No access

Page A 20 - A 21
VDI Fachmedien GmbH & Co. KG, Düsseldorf 2025

Cover of Volume: Bauingenieur Volume 100 (2025), Edition 11
Article
No access

Page A 22 - A 23
VDI Fachmedien GmbH & Co. KG, Düsseldorf 2025

Cover of Volume: Bauingenieur Volume 100 (2025), Edition 11
Article
No access

Page A 24 - A 25
VDI Fachmedien GmbH & Co. KG, Düsseldorf 2025

Cover of Volume: Bauingenieur Volume 100 (2025), Edition 11
Article
No access

Page 297 - 305
The construction industry is undergoing a profound transformation through digitalization and automation. While Building Information Modeling (BIM) has already revolutionized planning, on-site construction is lagging behind. Key technologies such as...
VDI Fachmedien GmbH & Co. KG, Düsseldorf 2025
Authors:

Cover of Volume: Bauingenieur Volume 100 (2025), Edition 11
Article
No access

Page 306 - 317
The construction industry increasingly develops sustainable concretes with alternative cements, recycled aggregates, and fiber reinforcement to reduce emissions and extend the service life of structures. Fiber-reinforced concretes with steel or...
VDI Fachmedien GmbH & Co. KG, Düsseldorf 2025
Authors:

Cover of Volume: Bauingenieur Volume 100 (2025), Edition 11
Article
No access

Page 318 - 325
This study quantifies the monetary effects of Building Information Modeling (BIM) through a systematic cost-benefit analysis of three use cases. Despite rising expectations for BIM, there is a lack of quantitative assessments of its economic...
VDI Fachmedien GmbH & Co. KG, Düsseldorf 2025
Authors:

Cover of Volume: Bauingenieur Volume 100 (2025), Edition 11
Article
No access

Page 326 - 336
This publication shows how the calculation of a life cycle assessment of a given building with a life cycle assessment tool differs when processed by different people. It is worked out where the differences are and how they come about. The results...
VDI Fachmedien GmbH & Co. KG, Düsseldorf 2025
Authors:

Bibliography (98 entries)

  1. [14] Bilal Succar: The Five Components of BIM Performance Measurement Ausgabe 2010. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-48
  2. [26] Deubel, M.; Wolber, J.; Hagsheno, S.: Identifikation, Analyse und Kategorisierung von BIM-Anwendungsfällen/Identification, analysis and categorization of BIM use cases. In: Bauingenieur 93 (2018), 07-08, S. 295-303. doi.org/10.37544/0005–6650–2018–07–08–61. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-48
  3. [25] Lu, W.; Fung, A.; Peng, Y. et al.: Cost-benefit analysis of Building Information Modeling implementation in building projects through demystification of time-effort distribution curves. In: Building and Environment 82 (2014), S. 317-327. doi.org/10.1016/j.buildenv.2014.08.030. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-48
  4. [24] Chahrour, R.; Hafeez, M.A.; Ahmad, A.M. et al.: Cost-benefit analysis of BIM-enabled design clash detection and resolution. In: Construction Management and Economics 39 (2021), Heft 1, S. 55-72. doi.org/10.1080/01446193.2020.1802768. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-48
  5. [23] Sompolgrunk, A.; Banihashemi, S.; Mohandes, S.R.: Building information modelling (BIM) and the return on investment: a systematic analysis. In: Construction Innovation 23 (2021), Heft 1, S. 129-154. doi.org/10.1108/CI-06–2021–0119. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-48
  6. [22] Reizgevičius, M.; Ustinovičius, L.; Cibulskienė, D. et al.: Promoting Sustainability through Investment in Building Information Modeling (BIM) Technologies: A Design Company Perspective. In: Sustainability 10 (2018), Heft 3, S. 600. doi.org/10.3390/su10030600. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-48
  7. [21] Loredo Conde, A.J.; García-Sanz-Calcedo, J.; Reyes Rodríguez, A.M.: Use of BIM with photogrammetry support in small construction projects. Case study for commercial franchises. In: Journal of Civil Engineering and Management 26 (2020), Heft 6, S. 513-523. doi.org/10.3846/jcem.2020.12611. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-48
  8. [20] Lee, M.; Lee, U.-K.: A framework for evaluating an integrated BIM ROI based on preventing rework in the construction phase. In: Journal of Civil Engineering and Management 26 (2020), Heft 5, S. 410-420. doi.org/10.3846/jcem.2020.12185. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-48
  9. [19] Ham, N.; Moon, S.; Kim, J.-H. et al.: Economic Analysis of Design Errors in BIM-Based High-Rise Construction Projects: Case Study of Haeundae L Project. In: Journal of Construction Engineering and Management 144 (2018), Heft 6. doi.org/10.1061/(ASCE)CO.1943–7862.0001498. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-48
  10. [18] Giel, B.K.; Issa, R.: Return on investment analysis of building information modeling in construction. In: Journal of computing in civil engineering, S. 511-521. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-48
  11. [17] Deubel, M.: Untersuchungen zur Wirtschaftlichkeit von Building Information Modeling (BIM) in der Planungs- und Realisierungsphase von Bauprojekten. Karlsruher Institut für Technologie Ausgabe 2021. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-48
  12. [16] Kim, H.-S.; Kim, S.-K.; Kang, L.-S.: BIM performance assessment system using a K-means clustering algorithm. In: Journal of Asian Architecture and Building Engineering 20 (2021), Heft 1, S. 78-87. doi.org/10.1080/13467581.2020.1800471. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-48
  13. [15] Franz, B.; Messner, J.: Evaluating the Impact of Building Information Modeling on Project Performance. In: Journal of Computing in Civil Engineering 33 (2019), Heft 3. doi.org/10.1061/(ASCE)CP.1943–5487.0000832. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-48
  14. [27] Quian, A.Y.: Benefits and ROI of BIM for multi-disciplinary project management. National University of Singapore, 2012. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-48
  15. [13] Won, J.; Lee, G.: How to tell if a BIM project is successful: A goal-driven approach. In: Automation in Construction 69 (2016), S. 34-43. doi.org/10.1016/j.autcon.2016.05.022. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-48
  16. [12] Succar, B.; Sher, W.; Williams, A.: Measuring BIM performance: Five metrics. In: Architectural Engineering and Design Management 8 (2012), Heft 2, S. 120-142. doi.org/10.1080/17452007.2012.659506. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-48
  17. [11] Sebastian, R.; van Berlo, L.: Tool for Benchmarking BIM Performance of Design, Engineering and Construction Firms in The Netherlands. In: Architectural Engineering and Design Management 6 (2010), Heft 4, S. 254-263. doi.org/10.3763/aedm.2010.IDDS3. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-48
  18. [10] Rothenbusch, S.; Kauffeld, S.: Veränderungspotenziale durch die Digitalisierung der gewerkübergreifenden Kooperation von kleinen und mittleren Unternehmen im Baugewerbe in Richtung Building Information Modeling (BIM) – Eine Fallanalyse. In: Gruppe. Interaktion. Organisation. Zeitschrift für Angewandte Organisationspsychologie (GIO) 51 (2020), Heft 3, S. 299-317. doi.org/10.1007/s11612–020–00526-w. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-48
  19. [9] Jung-Lundberg, S.: Anwendung von Building Information Modeling (BIM) im Bereich kleinerer und mittelgroßer Wohnungsbaumaßnahmen – Entwicklung eines Modells zur Ermittlung des wirtschaftlichen und bauprozessualen Nutzens. München, Universität der Bundeswehr München, Dissertation, 2019. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-48
  20. [8] Mansson, D.; Sanchez, A.; Hampson, K. et al.: Assessing BIM performance through self-assessed benchmarking. In: Kahkonen, K.; Keinanen, M. (Hrsg.): Proceedings of the 20th CIB World Building Congress 2016, Volume 1 – Intelligent Built Environment for Life. Tampere University of Technology, 2016. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-48
  21. [7] Bahlau, S.; Klemt-Albert, K.: Evaluationen zu den Potenzialen von Building Information Modeling/Evaluations on the potentials of Building Information Modeling. In: Bauingenieur 93 (2018), 07-08, S. 286-294. doi.org/10.37544/0005–6650–2018–07–08–52. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-48
  22. [6] Bartels, N.; Eilers, M.; Pütz, C. et al.: IFC-basierte Verknüpfung von Risikoinformationen mit einem Bauwerksdatenmodell/IFC-based linking of the risk management process using a building data model. In: Bauingenieur 98 (2023), 01-02, S. 28-35. doi.org/10.37544/0005–6650–2023–01–02–56. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-48
  23. [5] Melzner, J.; Helbing, R.: Baubetrieb im Wandel: Strategien für das Bauen von morgen. In: Bauingenieur 100 (2025), 07-08, S. 204-213. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-48
  24. [4] Mellenthin Filardo, M.; Krischler, J.: Basiswissen zu Auftraggeber-Informationsanforderungen (AIA). BuildingSMART Deutschland e.V., BIM Basics, bSD Verlag, Berlin, 2020. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-48
  25. [3] Jünger, H.C.; Jocher, S.; Geppert, F. et al.: Ursachenanalyse von Kostensteigerungen bei kommunalen Hochbauprojekten/Cause analysis of cost increases in municipal building construction projects. In: Bauingenieur 98 (2023), Heft 09, S. 296-303. doi.org/10.37544/0005–6650–2023–09–60. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-48
  26. [3] Bundesministerium für Umwelt, Naturschutz und nukleare Sicherheit: Klimaschutz in Zahlen – Fakten, Trends und Impulse deutscher Klimapolitik, Ausgabe 2021. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-56
  27. [14] König, H.: Lebenszyklusanalyse von Wohngebäuden, Endbericht, 1. Auflage, 2018. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-56
  28. [13] Kaufmann, H.; Krötsch, S.; Winter, S.: Atlas mehrgeschossiger Holzbau – Grundlagen – Konstruktionen – Beispiele. Kapitel Lebenszyklusanalyse (Hafner, A. und König, H.). Edition DETAIL, München, 2022. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-56
  29. [12] Hafner, A.; Schäfer, S.: Environmental aspects of material efficiency versus carbon storage in timber buildings. In: European Journal of Wood and Wood Products 76 (2018), Heft 3, S. 1045-1059. doi.org/10.1007/s00107–017–1273–9. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-56
  30. [11] Hafner, A.; Schäfer, S.: Comparative LCA study of different timber and mineral buildings and calculation method for substitution factors on building level. In: Journal of Cleaner Production 167 (2017), S. 630–642. https://doi.org/10.1016/j.jclepro.2017.08.203. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-56
  31. [10] Lehrstuhl Ressourceneffizientes Bauen (Reb), Ruhr-Universität Bochum: Einteilung der Lebenszyklusinformation in Module nach DIN EN 15978:2012, Ausgabe 2023. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-56
  32. [9] Informationsportal Nachhaltiges Bauen: Nutzungsdauern von Bauteilen – Nutzungsdauern von Bauteilen für Lebenszyklusanalysen nach Bewertungssystem Nachhaltiges Bauen. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-56
  33. [8] DIN EN 15978:2024, Nachhaltigkeit von Bauwerken – Bewertung der Umweltleistungen von Gebäuden – Methodik; Deutsche und Englische Fassung prEN 15978:2024. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-56
  34. [7] DIN EN ISO 14040:2021–02, Umweltmanagement – Ökobilanz – Grundsätze und Rahmenbedingungen (ISO_14040:2006_+ Amd_1:2020); Deutsche Fassung EN_ISO_14040:2006_+ A1:2020. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-56
  35. [6] Ciroth, A: Ökobilanzierung als Werkzeug für den Umweltschutz – Entwicklung eines Bewertungsverfahrens zur Auswahl umweltverträglicher Prozesse unter Berücksichtigung von Unsicherheiten, Technische Universität Berlin, Dissertation, 2001. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-56
  36. [5] VDI Zentrum für Ressourceneffizienz (VDI ZRE): Ressourceneffizienz im Bauwesen – Von der Planung bis zum Bauwerk, 1. Auflage, Berlin, 2019. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-56
  37. [4] Energieaufwand für Gebäudekonzepte im gesamten Lebenszyklus Abschlussbericht, www.re-source.com/wp-content/uploads/2019/11/UBA-2019-Energieaufwand-Gebaeudekonzepte.pdf [Zugriff am: 26.05.2025]. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-56
  38. [2] Hagsheno, S.; Deubel, M.; Spenner, L.: Digitale Technologien und deren Wertschöpfungspotenziale für die Bauwirtschaft/Identification and description of relevant digital technologies for the construction industry. In: Bauingenieur 94 (2019), Heft 02, S. 45-55. doi.org/10.37544/0005–6650–2019–02–31. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-48
  39. [2] Bonn Climate Conference, www.cop-23.org/ [Zugriff am: 26.05.2025]. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-56
  40. [1] Paris Climate Conference, pp. COP21e2015., www.cop21paris.org/about/cop21 [Zugriff am: 26.05.2025]. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-56
  41. [36] DIN 276, Kosten im Bauwesen. Ausgabe Dezember 2018. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-48
  42. [35] buildingSMART Schweiz: Use Case Management, 2025, https://ucm.buildingsmart.org/de/use-cases [Zugriff am: 19.05.2025]. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-48
  43. [34] DIN EN ISO 19650–1, Organisation und Digitalisierung von Informationen zu Bauwerken und Ingenieurleistungen, einschließlich Bauwerksinformationsmodellierung (BIM) – Informationsmanagement mit BIM. Ausgabe August 2019. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-48
  44. [33] Bundesministerium der Verteidigung (BMVg), Bundesministerium für Wohnen, Stadtentwicklung und Bauwesen (BMWSB), Bundesanstalt für Immobilienaufgaben: Arbeitshilfe Anwendungsfallsteckbriefe – BIM-Handbuch. BIM für Bundesbauten Ausgabe 2023. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-48
  45. [32] Borrmann, A.; Forster, C.; Liebich, T. et al.: Germany’s Governmental BIM Initiative – The BIM4INFRA2020 Project Implementing the BIM Roadmap. In: Santos, T.; Riva (Hrsg.): Proceedings of the 18th International Conference on Computing in Civil and Building Engineering, Lecture Notes in Civil Engineering. Springer International Publishing [S.l.], 2021, S. 452-465. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-48
  46. [31] Hollermann, S.; Schwerdtner, P.; Pfeiffer, U.: BIM-Reifegrad in Niedersachsen Jade Hochschule. Wilhelmshaven, 2023. doi.org/10.2314/KXP:1865872237. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-48
  47. [30] EU BIM Task Group: Calculating Costs and Benefits for the use of Building Information Modelling in Public Tenders – Methodology Handbook (2021). Open Google Scholar doi.org/10.37544/0005-6650-2025-11-48
  48. [29] Hoffmann, W.; Körkemeyer, K.: Zum Umgang mit der Komplexität von Bauvorhaben – Ergebnisse einer Expertenbefragung/Handling of Complexity in Construction Projects – Results from an Expert Survey. In: Bauingenieur 93 (2018), Heft 09, S. 347-354. doi.org/10.37544/0005–6650–2018–09–47. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-48
  49. [28] Walasek, D.; Barszcz, A.: Analysis of the Adoption Rate of Building Information Modeling [BIM] and its Return on Investment [ROI]. In: Procedia Engineering 172 (2017), S. 1227-1234. doi.org/10.1016/j.proeng.2017.02.144. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-48
  50. [13] Yang, C.-H.; Wu, T.-H.; Xiao, B. et al.: Design of a robotic software package for modular home builder. In: Proceedings of the 36th ISARC, Banff, Canada (2019), doi.org/10.22260/ISARC2019/0163. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-27
  51. [6] Bergmeister, K.: Stochastik in der Befestigungstechnik mit realistischen Einflussgrößen. Dissertation, University of Innsbruck, Faculty of Civil Engineering and Architecture, Innsbruck (1988). Open Google Scholar doi.org/10.37544/0005-6650-2025-11-36
  52. [5] Fang, Q., Wu, H.: Concrete structures under projectile impact. In: Concrete Structures Under Projectile Impact (2017) pp. 497-558, Springer, Singapore, doi.org/10.1007/978–981–10–3620–0_12. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-36
  53. [4] Hilti Corporation: Direct Fastening Technology Manual 2023. Online manual of fastening technology, Schaan: Hilti Deutschland AG (2023). Open Google Scholar doi.org/10.37544/0005-6650-2025-11-36
  54. [3] Eligehausen, R., Mallée, R., Silva, J. F.: Anchorage in Concrete Construction. Berlin: Ernst & Sohn Verlag (2006), doi.org/10.1002/maco.200690128. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-36
  55. [2] F. Altun, T. Haktanir, K. Ari: Effects of steel fiber addition on mechanical properties of concrete and RC beams, Constr. Build. Mater. 21 (2007), doi.org/10.1016/j.conbuildmat.2005.12.006. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-36
  56. [1] ACI PRC-544.1R-96, Report on Fiber Reinforced Concrete (Reapproved 2009), American Concrete Institute, Farmington Hills, MI, USA, (2009). Open Google Scholar doi.org/10.37544/0005-6650-2025-11-36
  57. [19] Mendoza, J.; de-la-Bandera, I.; Álvarez-Merino, C.S. et al.: 5G for Construction: Use Cases and Solutions. In: Electronics 10 (2021), Heft 14. doi.org/10.3390/electronics10141713. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-27
  58. [18] Oraskari, J.; Kirner, L.; Zöcklein, M.et al.: „A Method to Unify Custom Properties in IFC to Linked Building Data Conversion“. In: LDAC – 12th Linked Data in Architecture and Construction Workshop: Proceedings. Bochum: RWTH Aachen University (2024), S. 170-179. doi.org/10.18154/RWTH-2024–10706. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-27
  59. [17] Kirner, L.; Zöcklein, M.; Oraskari, J.et al.: „Loosely coupled observation processing and data exchange system for complex teams of on-site construction robots“. In: Robotic Fabrication in Architecture, Art and Design (2024). Toronto, ON, Canada, May 2024. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-27
  60. [16] Vega-Torres, M.A.; Pfitzner, F.: Investigating Robot Dogs for Construction Monitoring: A Comparative Analysis of Specifications and On-site Requirements. In: Proceedings of the 34th Forum Bauinformatik 2023, Sep. 2023. doi.org/10.13154/294–10094. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-27
  61. [15] bauma 2025 – Innovationen der Baumaschinentechnik, https://bauvolution.de/2025/04/10/bauma-2025-innovationen-in-der-baumaschinentechnik/ / [Zugriff am: 24.04.2025]. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-27
  62. [14] Slepicka, M.; Borrmann, A.: Fabrication Information Modeling for Closed-Loop Design and Quality Improvement in Additive Manufacturing for Construction. In: Automation in Construction, Vol. 168 (2024), S. 10579. doi.org/10.1016/j.autcon.2024.105792. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-27
  63. [7] Gerber, W.: Theorie zum Eintreiben und Verankern von Bolzen in Beton. Bauingenieur, 62, 213-218 (1987). Open Google Scholar doi.org/10.37544/0005-6650-2025-11-36
  64. [12] Zhu, A.: A Robotic Construction Simulation Platform for Light-weight Prefabricated Structures. (2023) [Phd Thesis 1 (Research TU/e / Graduation TU/e), Built Environment]. Eindhoven University of Technology. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-27
  65. [11] Vega-Torres, M. A.; Ribic, A.; García de Soto, B. et al.: BIMCaP: BIM-based AI-supported LiDAR-Camera Pose Refinement. In: Proc. of the 31st International Conference on Intelligent Computing in Engineering (EG-ICE 2024), 2024. doi.org/10.48550/arXiv.2412.03434. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-27
  66. [10] Vega-Torres, M. A.; Braun, A.; Borrmann, A.: SLAM2REF: Advancing Long-Term Mapping with 3D LiDAR and Reference Map Integration for Precise 6-DoF Trajectory Estimation and Map Extension. In: Construction Robotics, Vol. 8 (2024), Iss. 2, pp. 13. doi.org/10.1007/s41693–024–00126-w. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-27
  67. [9] Xiao, B.; Chen, C.; Yin, X.: Recent Advancements of Robotics in Construction. In: Automation in Construction, Vol. 144 (2022), Iss. 104591. doi.org/10.1016/j.autcon.2022.104591. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-27
  68. [8] Seiß, S.; Lünig, J.; Melzner, J.: “Ontologie zur baubegleitenden Qualitätssicherung”. In: Bauingenieur 100 (2025), Heft 06 doi.org/10.37544/0005–6650–2025–06–39. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-27
  69. [7] Helm, V.: „In-situ-Fabrikation: Integrale computergestützte Fertigung von Architektur“. In: e-Publications@khm, 2014. e-publications.khm.de/files/3/141031_InsituFabrikation_Diss_Helm.pdf. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-27
  70. [6] Bock, T.; Linner, T.: „Robot-Oriented Design: Design and Management Tools for the Deployment of Automation and Robotics in Construction“. In: Cambridge University Press, 2015. doi.org/10.1017/CBO978110715696. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-27
  71. [5] Kraus, M. A.; Drass, M.: “Künstliche Intelligenz im Bauingenieurwesen – Hintergründe, Status Quo und Potentiale”. In: Bauingenieur 10 (2020), S. 369-378. doi.org/10.37544/0005–6650–2020–10–39. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-27
  72. [4] Schmailzl, M.; Saffert, A. S.; Karamara, M. et al: “Enhancing Decision-Making for Human-Centered Construction Robotics: A Methodological Framework”. In: Proceedings of the 41st International Symposium on Automation and Robotics in Construction, S. 637-644 (2024). doi.org/10.22260/ISARC2024/0083. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-27
  73. [3] Islam, M. M.; Prodhan, R. K.; Shohel, M. S. H. et al.: Robotics and Automation in Construction Management Review Focus: The application of robotics and automation technologies in construction. In: Journal of Next-Gen Engineering Systems, 2(01), 48-71 (2025). doi.org/10.70937/jnes.v2i01.63. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-27
  74. [2] Steinjan, J.; Braun, J.-D.; Kirner, L. et al.: „EConoM – Edge computing, AI and 5G campus networks in nomadic application for construction site management“. HOCHTIEF ViCon GmbH, Research & Development, Germany / Chair of Individualized Production, RWTH Aachen University, Germany, 2024. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-27
  75. [19] Spyridis, P.; Hufelschulte, F.; Mellios, N.: Einfluss der Stahlfaserbewehrungsarten auf den Betonversagenswiderstand von Befestigungen. Beton‐und Stahlbetonbau, 117(3) (2022), 176-185, doi.org/10.1002/best.202100101. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-36
  76. [1] Borrmann, A.; König, M.; Koch, C. et al. (Hrsg.): Building Information Modeling – Technologische Grundlagen und industrielle Praxis. Springer Fachmedien Wiesbaden, Wiesbaden, 2021. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-48
  77. [29] Clark, A.: A Comparison of Correlation Measures. University of Notre Dame, Indiana, United States of America, 2 May 2013. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-36
  78. [28] EOTA – European Organisation for Technical Approvals: Technical Report TR 048 “Details of tests for post-installed fasteners in concrete”. Brussels (2016). Open Google Scholar doi.org/10.37544/0005-6650-2025-11-36
  79. [27] BarChip48: EPC BarChip 48 , Macro Synthetic Fibre, Product data sheet. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-36
  80. [26] NV BEKAERT SA: Dramix Steel fibers for Concrete Reinforcement, Environmental Product Declaration Type III ITB No. 312/2022. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-36
  81. [25] Spyridis. P.; Strauss. A.; Di-Sario. M.: Principles For the Evaluation of Redundancy in Fastening Systems. Life-Cycle Civil Engineering: Innovation, Theory and Practice, 1st Edition, (2021) 9780429343292, doi.org/10.1201/9780429343292–177. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-36
  82. [24] Spyridis, P.; Strauss, A.: Robustness assessment of redundant structural systems based on design provisions and probabilistic damage analyses. Buildings 10.12 (2020), doi.org/10.3390/buildings10120213. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-36
  83. [23] Mellios, N.; Yousef, A.; Spyridis, P.: Probabilistic finite elements of direct fixings in concrete with discrete aggregates. In: (eds. Di Prisco, M., Meda, A., Balázs, G.L.) Proceedings of the 14th fib PhD Symposium, Rome, Italy, 5-7 September 2022, doi.org/10.35789/fib.bull.0105. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-36
  84. [22] Yousef, A.; Mellios, N. ;Spyridis, P.: Probabilistic finite elements of direct fixings in concrete with discrete steel-fibres. In: (eds. Di Prisco, M., Meda, A., Balázs, G.L.) Proceedings of the 14th fib PhD Symposium, Rome, Italy, 5-7 September 2022, doi.org/10.35789/fib.bull.0105. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-36
  85. [21] Yousef, A.; Spyridis, P.: Structural and redundancy performance of power actuated fasteners as direct fastenings in fiber reinforced concrete. Structural Concrete (2025) doi.org/10.1002/suco.70071. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-36
  86. [20] Mellios, N.; Losse, J.; Spyridis, P. : Hybrid assessment of fiber orientation influence on the load resistance of anchors in SFRC. Civil Engineering Design, 5(5-6) (2024), 107-117, doi.org/10.1002/cend.202300014. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-36
  87. [1] Forschungsprojekt EConoM, www.econom.one/ [Zugriff am: 24.04.2025]. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-27
  88. [18] Spyridis, P.; Mellios, N.: (2022) Tensile performance of headed anchors in steel fiber reinforced and conventional concrete in uncracked and cracked state. Materials, 15(5), 1886, doi.org/10.3390/ma15051886. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-36
  89. [17] Scholz, R.; Franck, P.; Yousef, A.: Validating the performance of direct fastening (PAF) into concrete with high‐speed measuring technology. ce/papers, 6(5)(2023), 213-220, doi.org/10.1002/cepa.2740. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-36
  90. [16] Langenbeck, A. D., Spyridis, P., Beßling, M.: Experimental investigations of power-actuated fastenings in TRC. Developments in the Built Environment, 14 (2023) 100158, doi.org/10.1016/j.dibe.2023.100158. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-36
  91. [15] Lamanna, AJ; Bank LC; Scott, DW: Flexural strengthening of reinforced concrete beams by mechanically attaching fiber-reinforced polymer strips. Journal of composites for construction, 8(3):203–10 (2004), doi.org/10.1061/(asce)1090–0268(2004)8:3(203). Open Google Scholar doi.org/10.37544/0005-6650-2025-11-36
  92. [14] Michels, J., Shahverdi, M., Czaderski, C.: Flexural strengthening of structural concrete with iron-based shape memory alloy strips. Structural Concrete, Volume 19, Issue 3, fib, Berlin: Ernst & Sohn Verlag (2018), doi.org/10.1002/suco.201700120. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-36
  93. [13] Su, R. K. L., Shan, Z. W.: Axial strengthening of RC columns by steel encasement with direct fastening connection. IOP Conference, Material Science and Engineering (2019), doi.org/10.1088/1757–899x/660/1/012055. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-36
  94. [12] Shan, Z. W., Looi, D. T. W., Su, R. K. L.: A novel seismic strengthening method of RC columns confined by direct fastening steel plates. Engineering Structures, 218, 110838. (2020), doi.org/10.1016/j.engstruct.2020.110838. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-36
  95. [11] Gould, W., Lichti, D.: Power Forward: Diving Power-Actuated Fastener (PAF) Code Provisions. STRUCTURE magazine, Ilinois: Structure (2013). www.structuremag.org/article/power-forward-driving-power-actuated-fastener-paf-code-provisions. Open Google Scholar doi.org/10.37544/0005-6650-2025-11-36
  96. [10] DIN CEN/TR 17079. Design of anchorage of fastening systems in concrete – Redundant non-load-bearing systems. Berlin: Beuth Verlag (2019). Open Google Scholar doi.org/10.37544/0005-6650-2025-11-36
  97. [9] EAD 330083–02–0601. Power-actuated fastener for multiple use in concrete for non-structural applications. Brussels: EOTA. (2018). Open Google Scholar doi.org/10.37544/0005-6650-2025-11-36
  98. [8] Patzak, M.: Zur Frage der Sicherheit von Setzbolzenbefestigungen in Betonbauteilen. Beton + Fertigteil-Technik, Issue 5/1979, Wiesbaden: Bauverlag (1979). Open Google Scholar doi.org/10.37544/0005-6650-2025-11-36

Latest issues

Bauingenieur
See all issues
Cover der Ausgabe: Bauingenieur Jahrgang 101 (2026), Heft 03
Ausgabe No access
Organ des VDI Fachbereichs Bautechnik
Jahrgang 101 (2026), Heft 03
Cover der Ausgabe: Bauingenieur Jahrgang 101 (2026), Heft 01-02
Ausgabe No access
Organ des VDI Fachbereichs Bautechnik
Jahrgang 101 (2026), Heft 01-02
Cover der Ausgabe: Bauingenieur Jahrgang 100 (2025), Heft 12
Ausgabe No access
Organ des VDI Fachbereichs Bautechnik
Jahrgang 100 (2025), Heft 12
Cover der Ausgabe: Bauingenieur Jahrgang 100 (2025), Heft 11
Ausgabe No access
Organ des VDI Fachbereichs Bautechnik
Jahrgang 100 (2025), Heft 11
Cover der Ausgabe: Bauingenieur Jahrgang 100 (2025), Heft 10
Ausgabe Partial access
Organ des VDI Fachbereichs Bautechnik
Jahrgang 100 (2025), Heft 10